Indosnesia Indonesia

Indonesia

Penulis

  • Sukmo Gunardi unnur

Abstrak

 

This study  focuses on efforts to reduce the  risk of  work accidents at PT Chroma International using  FMEA and FTA methods. The purpose of  this study  is to analyze the  potential for priority work accidents that occur in  wind tunnel production using the  FMEA (Failure Mode and Effect Analysis)   method, to analyze the causes    Work accidents are prioritized in order to  take preventive measures using the  FTA (Fault Tree Analysis) method.  The methods used are the FMEA (Failure Mode and Effect Analysis)  method and  the FTA (Fault Tree Analysis) method. After conducting an  analysis using the FMEA (Failure Mode and Effect Analysismethod on  accidents that occurred at PT Chroma International, the  potential for priority work accidents was obtained, namely hands and feet being hit by  grinders with an RPN (Risk Priority Numbervalue of 112.71. After analyzing  using  FTA (Fault Tree Analysis) so that  13 causes of  priority accidents  were obtained, namely uncomfortable  using PPE (  Personal Protective Equipment), lack of coordination,  less well  , lack of  concentration,  lack of  enthusiasm, excessive joking, not paying attention to the situation,  limited workspace,  slippery work floor ,  messy work  environment, PPE (  Personal Protective Equipment) unavailable,  lack of  attention and lack of experience

 

Keyword : Risk, Work accident, FMEA, FTA

Diterbitkan

2025-06-16

Terbitan

Bagian

Articles